EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
RANS21RB
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (676)
Research
Workshop
- (4)
Empennage
- (37)
Fuselage
- (155)
Firewall
- (19)
Tail Feathers
- (4)
Wings
- (99)
Controls
- (20)
Avionics
- (52)
-
Wiring
-
Glareshield LED lights
-
Glare shield GPS and...
-
Wiring
-
Wiring
-
Wiring, Etc
-
Wiring Cleanup
-
Wiring
-
Wiring
-
Wiring and firewall
-
Pitot Static lines
-
Wiring
-
Main Bus
-
Wiring
-
wiring
-
Wiring
-
Wiring Testing
-
Wiring
-
Wiring
-
Stick Grip Wiring
-
Wiring
-
ELT and Stick Grip...
-
Wiring
-
Wiring
-
Wiring
-
Wiring
-
Panel Power Up
-
First Power-Up of Panel
-
Antenna Leads
-
Panel Supports
-
Remote Avionics
-
Avionics Tray
-
Avionics Tray Backup...
-
Backup Battery Install
-
Remote Avionics Tray
-
Remote Avionics Install
-
Avionics tray
-
Removed avionics...
-
Avionics mounting
-
Instrument panel
-
First Panel Install
-
First uncrating of...
-
Remote Avionics fit...
-
GPS Antenna Doubler...
-
VHF 2 Antenna Mount...
-
Antenna Doublers
-
Antenna Doubler
-
Mounts
-
AP Roll Servo
-
AP Servos
-
ELT and VHF #1...
Lighting
- (9)
Instrument Panel
- (8)
Landing Gear
- (6)
Engine
- (82)
Propeller
Fuel System
- (6)
Interior Finish
- (28)
Paint / Decals
- (90)
Inspection
- (3)
Tools
Inventory
- (3)
Kit Delivery
- (1)
Reassembly
- (50)
Builder Name:
Randall Brooks
-
Project:
Rans - S-21 Outbound
-
VIEW REPORTS
Total Hours:
1988
Total Flight Time:
Start/Last Date:
Apr 03, 2021 - No Finish Date
Engine:
Titan IO-340 180HP
Propeller:
Whirlwind
Friendly URL:
https://eaabuilderslog.org?s=RANS21RB
Home or Last Project Picture
Aug 29, 2022
First Power-Up of Panel
- (4 hours)
Category: Avionics
Completed routing and attaching avionics wiring. Checked all plugs and connections. Connected 13.8V power supply to Battery Master board and connected all grounds to (-) side of power supply. Pulled all CB and insured Avionics Master switch was off. Turned on 1 avionics unit at a time to insure wiring was correct. Tested all avionics individually and everything powered up correctly. No smoke!! Finally, I powered up all connected units at once. Still no issues. Continued to routed antenna cables and assorted wiring to rear of cockpit area.
First Power Up of Avionics 29 Aug 2022 (1).jpg
First Power Up of Avionics 29 Aug 2022 (10).jpg
First Power Up of Avionics 29 Aug 2022 (14).jpg
First Power Up of Avionics 29 Aug 2022 (2).jpg
First Power Up of Avionics 29 Aug 2022 (4).jpg
First Power Up of Avionics 29 Aug 2022 (7).jpg
First Power Up of Avionics 29 Aug 2022 (8).jpg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.